Yes. Practice evaluations in Onspring are auto-created based on the selected targeted maturity level. For example, if your organization maintains Level 2 status, Onspring will scope your project to auto-select the controls and control objectives that satisfy Level 2 maturity. If and when your organization moves to Level 3, you can simply change the maturity level in the pre-built application to correspond with the Level 3 assessment criteria.
Can I trigger CMMC evaluations based on specific CMMC 2.0 maturity levels?
|
Updated:
|
Published: